Travelodge, Pool, Cornwall Case Study

  • Location – Pool, Cornwall
  • Project type – Supply and Erect
  • Start Date – March 2018
  • Size 1800m2
  • Number of Bedrooms- 63
  • Erect period – 10 weeks

This Travelodge in Pool, Cornwall, was our first project with this large Cornish contractor, and was a huge success, finishing a week ahead of programme, despite the snowy conditions we had to contend with.

The clients project team were keen to maximise the offsite potential, and we provided our Thermo closed panel, factory assembled floor cassettes, pre-fitted Fermacell boarding to the party walls, and spandrel panels. Along with pre-insulated and Fermacell’d corridor walls, and factory fitted ply pattresses over window heads.

 